Activity 10.2 (a) Infrastructure The route determination of roads and design of associated physical infrastructure where – it is a public road Activity 10.1 (b) Infrastructure The construction of public roads Subdivision of Farm Neuweiler No. 525 into Portions A to G and Remainder, Windhoek; Registration of A 20m wide Right of Way Servitude over the Remainder of Farm Neuweiler No. 525 in favour of Portions A to G of Farm Neuweiler No. 525; Rezoning of Portions, A to G of Farm Neuweiler No. 525, Windhoek from “Agriculture” to “Single Residential”.
Prpject status APPROVED
Ministry of Environment and Tourism
Department of Environmental Affairs
(+264 -61) 284 2701 (T)
(+264-61) 240 339 (F)
http://www.met.gov.na